After accepting the settings in the Hanger Distribution Settings dialog, the Select Objects dialog will show prompting to select elements runs:


  • You can check the box for Multiple to select multiple runs of multiple systems
    • Note: Each run will be handled separately when processing.
  • Select the desired amount of runs.
  • Click the Process button.
  • BIMrx will automatically proceed to the Select Hanger For Service dialog:


Notes:
  1. The Hanger Array command currently works for design and fabrication ducts and pipes; it does not currently work on design piece conduits and cable tray systems.